In the end of autumn 2015 the garden project finally became finished, the final result was really nice and is close to the concept drawings made back in 2014 (se concept drawings below).
For now I’m gonna take a vaccation from the woodwork for a couple of months, some projects are spared until next summer as the remaining part with patio/pergola, plants and fence.
Gallery of final result of the garden project
Final result pool and terrace
Final result pool and terrace by night with lightning
Final result entrence
Final result entrence
Villa Annerberg, A-Hus – front
Result of paving stones joint up with lithomes joint sand
Jointing with paving stones with lithomex joint sand
Husqvarna automover 310
Blood maple tree
Blood maple tree
Japanese cherry tree
hornbeam shrubs planted
hornbeam (Latin: Carpinus betulus) shrubs in pots
Lawn being rolled out
Lawn being rolled out
Lawn being rolled out
Plant soil being prepared for the lawn
Finished lawn in front of house
Aquis fantasy pool 24 ready for action
Aquis fantasy pool 24
Aquis fantasy pool 24
Finished mounting the aquispool fantasy 24 framework
Aquispool fantasy 24 framework being mounted
150mm with packed gravel
Aqvis fantasy 24 template layed out on the pool bottom
Rotation laser leveling
Nort Explorer Trampoline cloth
Seamless transition between patio and paving
Finished House and garage pavers
Little man working as paving stone dealer
Concrete sawing
Finished sawing out the round lines in the paving stones
Cut out round line in the pavers
Paving stone in front house
Paving stone in front house
Beginning fixing the fantasi grey paving stone
Beginning of the driveway with benders fantasi greymix
FANTASI ANTIK
Unleash fantasy
Level string
Truck delivery of benders fantasi ground stone
End of day one for the excavation, alot of dirt and gravel to transport away
Excavator digging the hole for the trampoline
Alot of big rocks was found when excavting for the pool
Wooden decking in progress
Wooden framework beneath the patio
back garden before excavation
Wooden framework beneath the patio
concrete plinths placed in furrows
concrete plinths aligned with a plank
Preparation for pavers completed
Preparation for pavers completed
Wooden decking in progress
Preparation for paving with excavator
Preparation for paving
Preparation for paving
gravel path
Back garden preparing with excavator
Garage
Webkings new office
Finished hall
Training room
Home cinema room with 108″ screen
Kitchen with the new dinner table with six chairs in oak and white leather
Sewing room
Master bedroom
Finished kitchen
Outdoor lightning against black color
Outdoor lightning against black color
Ground color and the new matte black S8500-n color
Painting starts
Entrance
Entrance
Wallpapers finished in All room
Wall papers finished for work room
Living room – drywalled
Kitchen framework
Upstair stair – drywalled
red (NCS S4550-Y80R) concrete roof tiles from Jönåker and entrance doors YD106G in red (NCS S4550-Y80R) from Snickar Pär
House delivery finished
House delivery finished
House delivery
erection of scaffolding
district heating
house ground
excavator
concrete slab
agricultural land
Site spring
Site winter
Site summer
Villa Anneberg blueprint section
Villa Anneberg blueprint upper floor
Villa Anneberg blueprint garage
Villa Anneberg blueprint front
Villa Anneberg blueprint entrence
Villa Anneberg blueprint back
Leave a Reply