The summer has finally arrived and with that its time to take care of the garden projects that have been paused until the right time and weather. The first step was to level off the ground around the house. As you can se we had some problems that the rain water gathered in small areas at the backside of the house. With help of a excavator the ground was leveled out with a natural fall for the water to run of the ground.

Groove planning for upcoming garden
by
Leave a Reply