Skip to content
back garden before excavation
Excavation started for the pool
Halfway trough the excavation
Alot of big rocks was found when excavting for the pool
End of day one for the excavation, alot of dirt and gravel to transport away
End of day one for the excavation, alot of dirt and gravel to transport away
Pool bottom 158cm below surface
vibratory plate from atlas copco
150mm with packed gravel
The pool bottom, packed with gravel
Aqvis fantasy 24 template layed out on the pool bottom
Excavator digging the hole for the trampoline
Excavator digging the hole for the trampoline
Nort Explorer Frame
Paving stones
Nort Explorer Trampoline cloth
NORTH Explorer Low
Rotation laser leveling
NORTH Explorer Low
furrows
furrows
rotation laser
concrete plinths placed in furrows
concrete plinths placed in straight row
concrete plinths
concrete plinths aligned with a plank
Back garden with water collection / pond
Back garden prepared
Back garden preparing with excavator
Front garden prepared