Category: Projects

  • MTB Enduro Downhill in Le Tour Chamonix with the soft crew

    MTB Enduro Downhill in Le Tour Chamonix with the soft crew

    Mountainbike, enduro and downhill riding in Chamonix, France 2015 with the soft crew. From the village of Le Tour and Vallocirne, the Charamillon and Balme gondolas, and the Autannes chairlift, 2185 m, transport you over rich alpine pastures into a fabulous nature andStart: top of the Charamillon lift as far as Le Tour. Start 1850 […]

  • Final result of the garden project for Villa Anneberg

    Final result of the garden project for Villa Anneberg

    In the end of autumn 2015 the garden project finally became finished, the final result was really nice and is very close to the concept drawings made in -14

  • Trees and Shrubs planted

    Trees and Shrubs planted

    In the beginning of the autumn, mid september here i Linköping, Sweden it was time to plant some trees and shrubs. We planted four different trees and 500 pieces of hornbeam (Latin: Carpinus betulus) shrubs. The trees was about 2 metres and about four-five years old. The hornbeam shrubs was around 1,5 metres and 1,5 years. They […]

  • Husqvarna automower 310 robot mower installed

    Husqvarna automower 310 robot mower installed

    In the end of summer it was time to install and test out the Husqvarna automower 310. A quick installation of the cable and recharge of the batteries the Husqvarna automower 310 went out to cut the lawn like a golf course. After a couple of days the lawn was nice and even cut.

  • Paving stones finally fininshed

    Paving stones finally fininshed

    Finally all of the paving stones has been laid out, round lines cut out and joint up with joint sand.

  • Aqvis swimming pool fantasy 24 ready for action

    Aqvis swimming pool fantasy 24 ready for action

    In the end of september we finally managed to mount and fill upp the Aqvis swimming pool fantasy 24. The filter and waterpump is in place and the water is pumping trough the system and is heated with a heat exchanger connected to house long-distance district heating system. To see that everything worked we heated […]

  • Aquispool fantasy pool framework mounted

    Aquispool fantasy pool framework mounted

    Pool framework for the upcoming Aquispool fantasy 24 pool is finally mounted together. The pool framework contained of plastic studs mounted together forming the shape of the pool, then bolted to the concrete ground and supported with metall studs on the outside. When the pool framework was mounted together the process to refill with gravel outside of […]

  • Grass rolled out for lawn

    Grass rolled out for lawn

    Last week the delivery of 250 square meeter grass on rolls arrived. Before we could roll out the grass we needed to fill up the garden we the lawn should be with soil.

  • Cut out round lines in the concrete paving stones

    Cut out round lines in the concrete paving stones

    Today we began to cut out round lines in the paving stones benders fantasi thats going to connect the driveway with the entrance. First we measured out the center between the driveway and entrance, then we draw out a circle line from the center onto the paving stones. After that began the actual sawing place […]

  • Paving stone in front of house

    Paving stone in front of house

    Today the paving stone in front of the house was laid out, remaining work is to cut out the round radius of the half circles thats going to be in the pavings between driveway and entrance. It feels good to see how the final results is going to look and next week the hole pavings […]